Xcell Energy Equipment (Suzhou) Co., Ltd.
                                                                                                           
Verified Supplier
7 Years
Since 2019
Menu

Evaporative Cooling Tower Drift Loss PVC Cooling Tower Drift Eliminator Efficiency

Price Negotiable
Price: Negotiated
MOQ: 1 Set
Delivery Time: 7 Days
Brand: Xcell Energy
Product Description

Evaporative Cooling Equipment PVC Drift Eliminators

Description:

Drift Eliminators, made out of rigid PVC, are designed to remove entrained particles from air steam efficiently, with minimum pressure drop, thereby reducing the fan power requirement when the air passes through the Drift Eliminator. Water droplets are separated from the air drift at the three direction change points on the drift eliminator.For Cross flow tower applications, the almost vertical water conduits provided by the DE drift eliminator remove the water droplets out of the drift eliminator area and return them back into the tower and does not allow any re-entry.The special locking pin arrangement for DE facilitates quick and simple assembly at site.


Specifications:

 
Tech Date  
Sheet Width(mm) 170mm
Sheet Length 600mm/customized
Thickness 0.6mm/customized
Sheet Spacing 20mm
Color black

 

 

Droplet PVC Drift Eliminators 170mm Evaporative Cooling Equipment 1

Droplet PVC Drift Eliminators 170mm Evaporative Cooling Equipment 2

Droplet PVC Drift Eliminators 170mm Evaporative Cooling Equipment 3

 

Related Blade Drift Eliminator

Cellular PVC Drift Eliminator For Cooling Tower 25mm 140-145mm 2

Advantages:

 

1. Maximum drift capture through efficient design
2. Light weight
3. Easy to handle, lift and remove for inspection and service of water distribution system and heat transfer surface (fill and coil)
4. Nested modules to guarantee watertight seam
5. Corrosion free
6. Perfect fit: model specific size kits

 

PACKING AND DELIVERY

 

S Wave High Efficiency Drift Eliminators M Wave Cooling Tower Spares 6
S Wave High Efficiency Drift Eliminators M Wave Cooling Tower Spares 7

 

 
FAQ: 

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xcell Energy Equipment (Suzhou) Co., Ltd.
Location Room 306, Building A06, No. 66 Wanyuan Road, Dianshanhu Town, Kunshan City, Suzhou, China
Contact Person Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.