Xcell Energy Equipment (Suzhou) Co., Ltd.
                                                                                                           
Verified Supplier
7 Years
Since 2019
Menu

Cooling Tower PVC Fill Cooling Tower Infill Replacement

Price Negotiable
Price: Negotiated
MOQ: 1 Set
Delivery Time: 7 Days
Brand: Xcell Energy
Product Description
 

Cooling Tower Fill Film Black PVC Fill Pack

This industry cooling tower fill is suit for metric cooling tower. This fill should be fabricated from rigid, corrugated PVC sheets that are conducive to cooling water and UV protected. The froming process of fill is by vacuum thermofroming.

Compare with the other PVC fill, it allows for high water velocity, improve the water distribution and thermal mixing.

This industry cooling tower fill is well adapted to any induced draft or natural draft cooling tower using normal industrial water quality.

 

Production Details

 

Cooling Tower Fill, also called cooling tower infill film media. It is one of the most important components in cooling tower. It’s function is increase the exchange area of the gas and working fluid in order to achieve the cooling requirement. The working fluid was distributed onto the fill and spread into a thin film uniformly, by increasing the air-media interface and allowing waste heat to evaporate at an accelerated rate.

The type of symetrical non contact sheet is probably the most thermally efficient fill wordwide. Sharp horizotal corrugations allow even water redistribution on the sheet and water rotation for good contact with air. The offest flut design allows vertical rotation of air with limited pressure drop.

Xcell could supply a wide range of synthetic cooling tower fill for the cooling towers such as the counter flow and cross flow cooling tower fill. For more details, please kindly reference the following catalogue.

All the fills can be supplied in blocks of various sizes or in sheets. As to limit the transportation costs and actual demand, we usually provide the best suggestion for the ordering and shipping method.

 


Related Cooling Tower Film Fill

PP PVC International Cooling Tower Fill Replacement Cross Flow 20mm 4

PACKING AND DELIVERY

PP PVC International Cooling Tower Fill Replacement Cross Flow 20mm 5

 

PP PVC International Cooling Tower Fill Replacement Cross Flow 20mm 6

 

PP PVC International Cooling Tower Fill Replacement Cross Flow 20mm 7

 

FAQ

 

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xcell Energy Equipment (Suzhou) Co., Ltd.
Location Room 306, Building A06, No. 66 Wanyuan Road, Dianshanhu Town, Kunshan City, Suzhou, China
Contact Person Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.