Xcell Energy Equipment (Suzhou) Co., Ltd.
                                                                                                           
Verified Supplier
7 Years
Since 2019
Menu

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

Price Negotiable
Price: Negotiated
MOQ: 1 Set
Delivery Time: 7 Days
Brand: BAC
Product Description

BAC Cooling Tower Filler | Cooling Tower Heat Dissipation Film

Specifications:

 
Tech Date  
Sheet Width(mm) 1300mm
Sheet Length 2440mm/customized
Thickness 0.38-0.6mm/customized
Sheet Spacing 20mm
Color grey/black

 

The principle of operation of cooling tower fill is to put as much water surface area in contact with as much air as possible, for the longest amount of time possible. Film fills allow the water to form thin flowing sheets to expose as much water surface area as possible to the interacting flow.
Cooling tower sheet fills or media, come in many different forms and "micro-structures," each having unique characteristics to fit various applications. Film fills are selected for direct replacement, performance enhancement, and water condition compatibility. Each fill has performance characteristics that allow selections to be made for various heat loads, flow rates, water quality, and horse power combinations.

Polyvinyl Chloride Cooling Tower PVC Fills Price Hanging Cross Flow Media Sheet 0

Polyvinyl Chloride Cooling Tower PVC Fills Price Hanging Cross Flow Media Sheet 1

 

Related Cooling Tower Film Fill

 

EAC International Cooling Tower Fill Pvc Fills For Cooling Tower Industrial Equipment 8

• Outstanding thermal performance, will meet or exceed the performance of any OEM fill
• Unique method for quick and easy field installation, saves labor
• Nested shipment requires smallest fill staging area and low shipping costs
• Model-specific kits contain everything needed for an efficient installation, including detailed instructions, supports, hardware, and fill
• 2-week standard lead time

PACKING AND DELIVERY

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 6

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 7

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 8

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 9

 

Induced Draft Cooling Tower Fill Material Cooling Tower Fill Pack Counter Flow 610mm 10

 

 

FAQ

 

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xcell Energy Equipment (Suzhou) Co., Ltd.
Location Room 306, Building A06, No. 66 Wanyuan Road, Dianshanhu Town, Kunshan City, Suzhou, China
Contact Person Chen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.