SS304 316 Dismantling Joint DN300 PN16 Plumbing Compensator Double Flange
Price:
$56.2-189.6 per set
MOQ:
10 piece
Delivery Time:
1-7 day
Brand:
Liang He
Product Description
SS304/316 Dismantling Joint DN300 PN16 Plumbing Compensator Double Flange
Product Introduction
The dismantling joint consists of the main body, sealing ring, gland, telescopic short pipe and other components. This innovative product connects pumps, valves, and other equipment with pipelines into a unified system through full bolts, while allowing for adjustable displacement. During installation and maintenance, it can be adjusted according to on-site requirements, transferring axial thrust back to the entire pipeline system. This design enhances operational efficiency while providing protection for connected pumps and valves.
Product Advantages
- Excellent chemical and thermal stability
- Superior anti-friction and self-lubrication properties
- Reliable sealing performance
- Easy installation and maintenance
- Wide range of industrial applications
Product Parameters
| DN | PN10 | PN16 | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| D | K | Bolt holes | L | H | D | K | Bolt holes | L | H | |
| 40 | 150 | 110 | M16 4-19 |
180 | 330 | 150 | 110 | M16 4-19 |
180 | 330 |
| 50 | 165 | 125 | M16 4-19 |
180 | 330 | 165 | 125 | M16 4-19 |
180 | 330 |
| 65 | 185 | 145 | M16 4-19 |
180 | 330 | 185 | 145 | M16 4-19 |
180 | 330 |
| 80 | 200 | 160 | M16 8-19 |
200 | 350 | 200 | 160 | M16 8-19 |
200 | 350 |
| 100 | 220 | 180 | M16 8-19 |
200 | 350 | 220 | 180 | M16 8-19 |
200 | 350 |
| 125 | 250 | 210 | M16 8-19 |
200 | 350 | 250 | 210 | M16 8-19 |
200 | 350 |
| 150 | 285 | 240 | M20 8-23 |
200 | 350 | 285 | 240 | M20 8-23 |
200 | 350 |
| 200 | 340 | 295 | M20 8-23 |
220 | 380 | 340 | 295 | M20 12-23 |
220 | 380 |
| 250 | 400 | 350 | M20 12-23 |
220 | 380 | 400 | 355 | M24 12-28 |
230 | 400 |
| 300 | 455 | 400 | M20 12-23 |
220 | 380 | 455 | 410 | M24 12-28 |
250 | 420 |
Product Installation Steps
- Loosen the pressure plate bolts: Before installation, loosen the pressure plate bolts and extend the product to the required installation length.
- Align the flanges: Ensure both flanges are parallel and properly aligned. For power transmission joints with inner sleeves, align the sleeve direction with the medium flow.
- Install the sealing gasket: Position the sealing gasket between the flanges to prevent fluid leakage.
- Tighten the bolts: Use the diagonal method to sequentially tighten all bolts and nuts, ensuring proper torque specifications are met.
- Adjust the displacement: Fine-tune according to site requirements to allow for necessary movement during operation and maintenance.
Hot Selling Products
Single sphere rubber joint
Rubber duckbill check valve
PTFE lined bellows
Semi-circle mini repair clamp
Inventory Display
Workshop Display
Similar Products
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Henan Lianghe Pipeline Equipment Co.,Ltd
Location
Pipeline Industrial Park, Gongyi City, Henan Province, China
Contact Person
Kelly