1200mm Metal Stamping Tool Stage Die Prototype Metal Stamping For Washing Machine Cabinet
Price:
$10000-$50000
MOQ:
1 set
Delivery Time:
45days
Brand:
IDO
Product Description
DC51D-Z Metal Stamping Tool Stage Die For Washing Machine Cabinet
Description:
The Metal Stamping Tool Stage Die for Washing Machine Cabinet is a precision-engineered solution designed for accuracy, durability, and efficiency. Built from high-grade materials and advanced tooling techniques, it delivers consistent forming and punching performance, ensuring flawless cabinet components and reliable production quality.
Quick Detail:
- Cycle time: 6 to 14 seconds (determined according to product characteristics)
- 30 minute fast repair; 15 minute quick tool change
- Punch edge sharpening: after 300,000~500,000 shots
- Use software to manage the movement of each individual die.
- Only one set of press table and tools is required to produce cabinets, enabling a reduction in equipment costs.
- Only need to dismantle the sub-die when repairing or maintenance, without dismantling whole structure.
- A single set of tools is capable of producing multiple models, and tool changeover can be achieved via a program.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Practical Application in Production
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Stock
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Wuxi IDO Technology Co., Ltd.
Location
No.22 Xigang Road, Xishan District, Wuxi City, Jiangsu Province, China
Contact Person
Maggie Wu

