Wuxi IDO Technology Co., Ltd.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

SUS430 7T Progressive Metal Stamping Sheet Mould 2 Million Shots Stamping Die Design

Price Negotiable
Price: $10000-$50000
MOQ: 1 set
Delivery Time: 45days
Brand: IDO
Product Description

Metal Stamping Die SUS430 Stage Die For Washing Machine Drum Sheet Mould Life 2 Million Shots

 

Description:

The High-Precision, Long-Life, Cost-Efficient Metal Stamping Die – Stage Die for Washing Machine Drum Sheet is engineered to deliver accurate forming and consistent quality. Its robust design ensures extended service life and reduced maintenance costs, supporting high-volume production with reliable performance.

 

Quick Detail:

  • Cycle: 6–14s depending on product type.
  • Repairs completed within 30 minutes; tools swapped in 15 minutes.
  • Punch edges require sharpening after 300k–500k shots.
  • Software manages all die movements.
  • One press table and tool set sufficient for cabinet production, lowering costs.
  • Maintenance only requires sub-die removal.
  • One tool set can handle multiple models; tool change via program.

 

Specifications:

Mould/Tool Type
Stage tool/mould/die
Production Application
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
Metal Sheet Material
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
Mould Material
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
Mould Base
SD, LKM Standard, HASCO Standard, Self-made, etc.
Tolerance
±0.003mm
Hardness
Upon request
Surface Treatment
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
Precision Machining
CNC/ surface grinding machine/ wire cutting/ EDM
Measuring Instruments
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer /  caliper/ microscope/ micrometer, etc.
Drawing Format
DWG, STP, STEP, X_T, IGES, PDF
Design Software
Auto CAD, UG, Solidworks
Trade terms
FOB (Shanghai)
Mould Lead time
Generally 6~8 weeks (as per actual situation)

 

 

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Wuxi IDO Technology Co., Ltd.
Location No.22 Xigang Road, Xishan District, Wuxi City, Jiangsu Province, China
Contact Person Maggie Wu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.