Wuxi IDO Technology Co., Ltd.
                                                                                                           
Verified Supplier
16 Years
Since 2010
Menu

SUS430 7T Washing Machine Drum Sheet Metal Stage Stamping Die

Price Negotiable
Price: $10000-$50000
MOQ: 1 set
Delivery Time: 45days
Brand: IDO
Product Description

SUS430 7T Washing Machine Drum Sheet Metal Stage Stamping Die

Description:

The SUS430 7T Washing Machine Drum Sheet Metal Stage Stamping Die is designed for high-precision forming of stainless steel washing machine drum components. Featuring excellent wear resistance and dimensional stability, this die supports multiple stamping processes including deep drawing, punching, flanging, and embossing, ensuring consistent quality, smooth surfaces, and reliable performance for mass production.

Quick Detail:

  • Cycle: 6–14s depending on product type.
  • Repairs completed within 30 minutes; tools swapped in 15 minutes.
  • Punch edges require sharpening after 300k–500k shots.
  • Software manages all die movements.
  • Maintenance only requires sub-die removal.
  • One tool set can handle multiple models; tool change via program.

Specifications:

Mould/Tool Type Stage tool/mould/die
Production Application White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
Metal Sheet Material Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
Mould Material V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
Mould Base SD, LKM Standard, HASCO Standard, Self-made, etc.
Tolerance ±0.003mm
Hardness Upon request
Surface Treatment TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
Precision Machining CNC/ surface grinding machine/ wire cutting/ EDM
Measuring Instruments CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
Drawing Format DWG, STP, STEP, X_T, IGES, PDF
Design Software Auto CAD, UG, Solidworks
Trade terms FOB (Shanghai)
Mould Lead time Generally 6~8 weeks (as per actual situation)

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Wuxi IDO Technology Co., Ltd.
Location No.22 Xigang Road, Xishan District, Wuxi City, Jiangsu Province, China
Contact Person Maggie Wu

Request A Quote

Please check your email address.
Your message must be at least 20 characters.