SP810NC Automotive Stamping Die Stage Die For Heat Insulation Cover Automotive Injection Molding
Automotive Stamping Die SP810NC Stage Die For Heat Insulation Cover With Quick Die Change
Description:
Our Top-Quality Stage Die is specially designed for modern heat insulation cover stamping, delivering precision and reliability with every cycle. Engineered for durability and smooth operation, it streamlines the stamping process to maximize efficiency and minimize waste. Built to meet today’s production demands, this die ensures consistent, high-quality results while boosting output and reducing downtime. Perfect for manufacturers seeking speed, accuracy, and performance in heat insulation cover production.
Quick Detail:
- Each production cycle takes 6–14s depending on the product.
- Repairs complete in 30 minutes; tool changes in 15 minutes.
- Punch edges require sharpening after 300,000–500,000 uses.
- Die movements are controlled through software.
- Producing cabinets needs just one press table and tool set, lowering costs.
- Sub-dies alone are removed for maintenance.
- One tool set can produce multiple models, with program-based changeovers.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

