Home Appliance DC53D Sheet Metal Stamping Die for Washing Machine Front Panel
Price:
$10000-$50000
MOQ:
1 set
Delivery Time:
45days
Brand:
IDO
Product Description
Home Appliance DC53D Sheet Metal Stamping Die for Washing Machine Front Panel
Description:
The Steel Stamping Die Stage Die for Washing Machine Front Panel with Quick Die Change is engineered for high-precision and efficient sheet metal forming. Made from durable steel, this stage die ensures accurate shaping of washing machine front panels while maintaining tight tolerances and consistent performance. Its quick die change feature significantly reduces downtime, enhancing production efficiency and making it an ideal solution for appliance manufacturers seeking reliable, fast, and high-quality stamping tooling.
Quick Detail:
- Cycle time: 6–14s, depending on product characteristics.
- Fast repair within 30 minutes; tool change within 15 minutes.
- Punch edges sharpen after 300,000–500,000 strokes.
- Software controls die movements.
- Only sub-dies need dismantling for maintenance.
- One tool set can produce multiple models; changeover via program.
Specifications:
| Mould/Tool Type | Stage tool/mould/die |
| Production Application | White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...) |
| Metal Sheet Material | Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper |
| Mould Material | V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25 |
| Mould Base | SD, LKM Standard, HASCO Standard, Self-made, etc. |
| Tolerance | ±0.003mm |
| Hardness | Upon request |
| Surface Treatment | TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts |
| Precision Machining | CNC/ surface grinding machine/ wire cutting/ EDM |
| Measuring Instruments | CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc. |
| Drawing Format | DWG, STP, STEP, X_T, IGES, PDF |
| Design Software | Auto CAD, UG, Solidworks |
| Trade terms | FOB (Shanghai) |
| Mould Lead time | Generally 6~8 weeks (as per actual situation) |
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Wuxi IDO Technology Co., Ltd.
Location
No.22 Xigang Road, Xishan District, Wuxi City, Jiangsu Province, China
Contact Person
Maggie Wu

