Steel Progressive Stamping Tool For Dishwasher Tub Top 2100 X 1100MM Compound Die Stamping
Steel Stamping Die Stage Die For Dishwasher Tub Top Mould Size 2100×1000×600mm
Description:
The Steel Stamping Die Stage Die for Dishwasher Tub Top with mould size 2100×1000×600mm is engineered for precise and efficient sheet metal forming. Made from high-quality steel, this stage die ensures accurate shaping of dishwasher tub top components, maintaining tight tolerances and reliable performance. Its large mould size supports heavy-duty production, making it an ideal solution for appliance manufacturers seeking durable, high-precision, and high-efficiency stamping tooling.
Quick Detail:
-
Cycle: 6–14 seconds, depending on the product.
-
Repairs finished within 30 minutes; tools replaced in 15 minutes.
-
Punch edges sharpened every 300,000–500,000 strokes.
-
Software manages die motion.
-
Cabinets are produced using only one press table and tool set, lowering equipment cost.
-
Maintenance requires removing only sub-dies.
-
A single tool set produces multiple models; program-controlled changeover.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

