1000mm Dc51d Mold Stamp Stage Mold White Household Appliance Dishwasher Outer Door
Metal Stamping Mold For Stage Mold Of White Household Appliance Dishwasher Outer Door
Description:
Our Metal Stamping Mold for Stage Mold of White Household Appliance Dishwasher Outer Door is designed for high-precision forming of dishwasher outer door components. Engineered for durability and stable performance, this mold ensures accurate dimensions, consistent quality, and long service life. Suitable for various sheet metal materials used in white household appliances, it helps manufacturers improve production efficiency, maintain product standards, and support reliable large-scale manufacturing operations.
Quick Detail:
- Production speed: 6–14s per piece, product-based.
- Repairs <30 min; tooling <15 min.
- Punch edge sharpening after 300k–500k hits.
- Software governs die movements.
- One press table and one tool set suffice for cabinet production, minimizing cost.
- For repair, remove only sub-die.
- One tool set supports multiple models with software changeover.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

