1300MM 2T Refrigerator Cabinet Bottom Metal Stamping Mold Stage Mold 500k Cycles
Metal Stamping Mold Stage Mold Used In White Household Appliance Refrigerator Cabinet Bottom
Description:
Our Metal Stamping Mold Stage Mold Used in White Household Appliance Refrigerator Cabinet Bottom is engineered for high-precision forming of refrigerator cabinet bottom components. Designed for durability and consistent performance, this mold ensures accurate dimensions, stable production cycles, and long service life. Suitable for various sheet metal materials used in white household appliances, it helps manufacturers enhance production efficiency, maintain product quality, and support reliable large-scale manufacturing operations.
Quick Detail:
- Cycle runs 6–14s as per product.
- Maintenance finishes in 30 min; tool swap in 15 min.
- Punch edges sharpened at 300k–500k cycles.
- Software directs each die’s action.
- One press table + tool set reduce cabinet production cost.
- Only sub-die removed during repair.
- One tool set for different models with program changeover.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

