Refrigerator Water Drain Box 800mm 2T Hot Stamping Mould Mold Date Stamp
Metal Stamping Mold For Stage Mold Of White Household Appliance Refrigerator Water Drain Box
Description:
Our Metal Stamping Mold for Stage Mold of White Household Appliance Refrigerator Water Drain Box is designed for high-precision forming of refrigerator water drain box components. Built for durability and consistent performance, this mold ensures accurate dimensions, stable production cycles, and long service life. Suitable for various sheet metal materials used in white household appliances, it helps manufacturers improve production efficiency, maintain product quality, and support reliable large-scale manufacturing operations.
Quick Detail:
- Cycle time between 6 and 14 seconds (product-specific).
- Repairs in 30 minutes, tool swaps in 15.
- Punch edge service after 300k–500k shots.
- Software regulates die movements.
- Cabinet production uses one press table/tool set to lower cost.
- Only sub-die dismounted during maintenance.
- One tool set covers multiple models, changeover by program.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

