SE Washing Machine Cabinet Durable Steel Housing Precision Stamping Die For Front / Top Load Washers
SE Washing Machine Cabinet – High-Quality Durable Steel Housing for Front/Top Load Washers
Description:
The SE Washing Machine Cabinet is designed for both front and top load washing machines, providing superior durability and protection for internal components. Made from high-quality steel with corrosion-resistant coating, this cabinet ensures long-lasting performance and a sleek, professional appearance. Easy to assemble and compatible with various models, it is ideal for OEM production or replacement needs. Enhance the reliability and aesthetic of your washing machines with the SE Cabinet.
Quick Detail:
-
Product Name: SE Washing Machine Cabinet
-
Material: High-Quality Cold-Rolled Steel
-
Surface Finish: Anti-Corrosion Coating / Powder Coated
-
Applicable Type: Front Load and Top Load Washers
-
Function: Protect internal components and enhance machine stability
-
Feature: Durable, corrosion-resistant, easy to assemble
-
OEM & ODM: Supported
-
Certification: ISO9001, CE (if applicable)
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.

