Foshan Henghui Aluminum Innovation International Trade Co., Ltd.
                                                                                                           
Verified Supplier
0 Years
Since 2026
Menu

Premixing Natural Gas Burning System PLC Control Oil Burner System With Heat Storage Barrel

Price Negotiable
Price: USD 20,000
MOQ: 1 set
Delivery Time: 30 days
Brand: Bolv
Product Description

Premixing natural gas / oil burning system with heat storage barrel

Main configurations

Mechanism

Paret

Material/ model

Quantity

 

 

 

 

 

Burning system

Main burning gun

310S stainless steel

2 sets

Ignition gun

310S stainless steel

2 sets

Heat storage barrel

A3 steel plate

1 set

Burning fan

22kw, 3KW

1 set each

Inflow fan

37KW

1 set

Filter

DN80

1 piece

Reducing valve

DN80

1 piece

Reducing valve

DN20

1 piece

Solenoid valve

DN80

3 pieces

Solenoid valve

DN15

1 piece

Solenoid valve

DN15

2 pieces

 

 

 

Control system

PLC

 

1 set

Extended module

 

1 set

Touch screen

 

1 set

Flame detection

 

2 sets

Middle relay

 

1 set

Router and contactor

 

1 set

Inverter

 

2 sets

 

FAQ

1. What are the key points of daily inspection?
Temperature/furnace pressure, gas pressure/combustion status, furnace lining/sealing, degassing system, cooling water.

 

2. What is the regular maintenance cycle?
Daily: Clean the slag from the furnace mouth/flow channel; inspect the burner, ignition system, and seals.
Weekly: verify thermocouples/temperature control instruments; clean the scale in the water gap of the crystallizer; check the integrity of the filter plate.
Monthly: Conduct a comprehensive inspection of the lining thickness/cracks; calibrate the casting speed and traction synchronization; replace aged sealing rings/gaskets.
Every year: overhaul the furnace body (repair/reline the furnace lining); conduct a comprehensive inspection and maintenance of the casting machinery and electronic control system.

3. Safety precautions?
High temperature protection: Wear high temperature resistant clothing, protective face masks, and heat-insulating gloves to avoid burns.
Explosion protection: Leakage is strictly prohibited in gas furnaces, and regular leak detection is required; moist materials are prohibited inside the furnace to prevent explosions caused by water encountering aluminum liquid.
Emergency response: Equip with dry powder fire extinguishers and dry sand.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Foshan Henghui Aluminum Innovation International Trade Co., Ltd.
Location D12, Zone D, 3F, Comprehensive Building, Beside Yongkou Archway, Pingliu Road, Xiadong Community, Guicheng Subdistrict, Nanhai District, Foshan
Contact Person Huang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.