Self Adhesive Polymer Hdpe Waterproof Membrane No Leakage For Civil Air Defense Project

Price Negotiable
Price: USD 1.25‑3.5 /㎡
MOQ: 3000㎡
Delivery Time: Negotiable
Brand: shhous
Product Description

Hdpe Waterproof Membrane For Civil Air Defense Project

Product Introduction

HDPE polymer self-adhesive film waterproof membrane adopts high-density polyethylene as base material, compounded with special self-adhesive layer and release film. Adopting pre-laid reverse-bonding technology, the membrane is pre-laid on bedding layer, and post-poured concrete bonds tightly with adhesive layer, eliminating water channeling between waterproof layer and structural layer. It is a dedicated waterproof material for underground projects.

 

No. Item Index‑P
1 Tensile property Tensile force/(N/50 mm) ≥ 600
Tensile strength/MPa ≥ 16
Membrane breaking elongation/% ≥ 400
Phenomenon during stretching Adhesive layer shall not separate from main material or substrate
2 Nail‑rod tear resistance/N ≥ 400
3 Puncture‑resistance strength/N ≥ 350
4 Impact resistance (0.5 kg·m) No leakage
5 Static load resistance 20 kg, no leakage
6 Heat resistance 80 ℃, 2 h: no slipping, flowing or dripping
7 Low‑temperature bending property Main material:‑35 ℃, no crack
8 Low‑temperature flexibility Adhesive layer:‑25 ℃, no crack
9 Oil‑penetration resistance /number of sheets ≤ 1
10 Water‑channeling resistance (hydraulic gradient) 0.8 MPa/35 mm, 4 h no water channeling
11 Water impermeability (0.3 MPa,120 min) Water‑impermeable

Construction Method

1. Substrate Treatment: Make bedding surface flat, remove sharp debris and stones. No standing water is required; construction is allowed on damp base.

2. Pre-lay Membrane: Lay the membrane with sand-adhesive side towards concrete structure. Spread on bedding layer following layout lines and align membrane laps.

3. Lap Joint Treatment: Remove release film for long-side and short-side laps, bond self-adhesive layers together. Apply reinforcement layers at corners and internal/external angles.

4. Membrane Fixing: Fix and seal membrane ends and laps with pressure strips to prevent displacement.

5. Finished-product Protection: Prevent puncture by sharp objects after laying. Proceed with steel bar binding and concrete pouring timely.

6. Concrete Pouring: Pour post-poured concrete directly on membrane. Concrete will bond tightly with adhesive layer to achieve pre-laid reverse-bonding effect.

Note: For pre-laid application only. Not for exposed use. Hot-melt construction is forbidden.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Weifang Shihua Chemical Building Material Co., Ltd.
Location Shouguang City, Shandong Province, China
Contact Person Faye Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.