Anti Seepage Polyethylene Waterproofing Membrane For Canal And Small Water Conservancy

Price Negotiable
Price: USD 0.5‑1.5/㎡
MOQ: 3000㎡
Delivery Time: Negotiable
Brand: shhous
Product Description

Pe Pp Anti‑seepage Membrane For Canal And Small Water Conservancy

 

Product Features

 Durability, Environmental Friendliness, Subway Adaptability, Serviceability

1) The waterproofing membrane bonds directly with the cement structure relying on its surface structure, solving the problem that most organic waterproofing membranes cannot be directly bonded and laid with cement materials thus ensuring the stability of the system quality.

2) This is achieved by relying on the gap structure provided by the surface reinforcement layer of the waterproofing membrane to bond directly cement materials. In the waterproofing system, the bonding and laying between the waterproofing membrane the main structure of the building, as well as the bonding with the protective layer, adopt cement materials. Therefore, the structural stability is, and it does not weaken over time. It does not have the limitation that most waterproofing membrane products require the base layer of the to have a low moisture content (<9%); it is especially suitable for the construction environment of subway projects.

3) It solves the that the main waterproof material of organic waterproofing membrane products is easy to be damaged and aged when exposed; this is achieved by relying on the good oxidation resistance ozone resistance of polyethylene and polypropylene, as well as the cement structure that combines stably with the membrane and completely ultraviolet light.

4) The product is non-toxic and non-polluting, and does not pollute the environment during construction. It does not problems such as open-flame construction and environmental pollution of some waterproofing membranes.

performance metric

No. Item Standard Requirement
1 low-temperature bending -20 degrees Celsius no cracks
2 tensile strength Room temperature (23℃)≥50N/cm
3 elongation at break Room temperature (23℃)≥100N/cm
4 water impermeability 0.3Mpa, 30min no leakage

Product Installation Process and Finished Product Protection Requirements

 Accept the base layer (level course) → Clean the base layer (leveling course) → Prepare adhesive → Handle complex parts → Lay composite sheets → Inspect the construction quality composite sheets → Construct the protective layer → Acceptance.

Finished Product Protection Requirements:1. For the laid coil waterproof layer, protective measures shall be taken in a timely manner to prevent damage from and construction operations. 2. Before constructing the waterproof layer at expansion joints, pipes and other locations, temporary blocking shall be carried out after the waterproof layer is completed, the blocking shall be removed to ensure the pipes and joints are unobstructed and meet the functional requirements. 3 After the waterproof layer is constructed, the protective layer shall be completed in a timely manner. 4. During construction, the finished products that have been completed not be contaminated.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Weifang Shihua Chemical Building Material Co., Ltd.
Location Shouguang City, Shandong Province, China
Contact Person Faye Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.