Cold Applied Bituminous Waterproofing Coating Polymer Modified Asphalt For Engineering Projects
Price:
USD 0.5‑0.8/kg
MOQ:
1000kg
Delivery Time:
Negotiable
Brand:
shhous
Product Description
Cold Applied Polymer Modified Asphalt Waterproof Coating For Engineering Projects
Product Advantages
- Excellent film elasticity: Polymer‑modified formula, cured film has good elongation to accommodate minor substrate cracking and deformation.
- Superior waterproof sealing: Liquid applied, seamless continuous waterproof film to block capillary pores.
- Good substrate adaptability: Applicable on damp substrates, strong adhesion to concrete, cement mortar and partial metal surfaces.
- Easy detail treatment: Easy brushing on complex areas such as corners, pipe roots and construction joints for reinforcement.
- Water & aging resistance: Polymer‑asphalt compound resists water immersion, acid and alkali, durable for underground and indoor conditions.
- Safe cold‑applied work: Room‑temperature brushing, no open‑flame heating, simple operation without hot‑work risk.
- Compatible with waterproof membranes: Good compatibility with asphalt self‑adhesive membranes for composite waterproofing system.
Performance Indexes
| No. | Inspection Item | Technical Requirement | |
| 1 | Appearance | After stirring, the sample shall be uniform without color difference, gel, agglomerate and obvious asphalt filaments | |
| 2 | Solid content, % | ≥45 | |
| 3 | Heat resistance | No flowing, slipping or dripping at 110 ℃ | |
| 4 | Surface drying time, h | ≤8 | |
| 5 | Hard drying time, h | ≤24 | |
| 6 | Low‑temperature flexibility | Standard condition | No crack or fracture at 0 ℃ |
| 7 | Elongation at break | Standard condition, % | ≥600 |
Usage Method
- Substrate preparation: Remove dust, laitance and oil; clear loose and raised parts. Keep surface flat & solid, damp surface is acceptable without standing water.
- Mixing: One‑component: stir thoroughly before use. Two‑component: mix strictly according to ratio until uniform without particles.
- Detail reinforcement: Apply 1‑2 coats as extra layer on inside/outside corners, pipe roots and construction joints.
- Multi‑coat application: Apply thin coats successively. Next coat can be applied only after previous coat dries. Brush in cross directions to reach designed total thickness.
- Curing: Natural curing after finishing. Proceed to next procedure only after full curing.
- Protective layer: Apply cement mortar protective layer after film curing for basement and roof projects to prevent mechanical damage.
Similar Products
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Weifang Shihua Chemical Building Material Co., Ltd.
Location
Shouguang City, Shandong Province, China
Contact Person
Faye Wang
