No Mixing Polyurethane Waterproofing Coating Price For Bathroom

Price Negotiable
Price: USD 1.5‑1.8/kg
MOQ: 1000kg
Delivery Time: Negotiable
Brand: shhous
Product Description

No-mixing One-component Polyurethane Waterproof Coating For Bathroom

 

Advantages for Bathroom

  1. Ready‑to‑use & easy application: One‑component without on‑site mixing, prevent waterproof failure caused by wrong proportioning, convenient for small‑space bathroom construction.
  2. Seamless rubber‑like film by moisture curing: Liquid‑formed coating fully covers high‑leakage positions such as corners, pipe roots and floor drains without lap joints, reduces leakage risks.
  3. High elasticity against deformation: High tensile strength and excellent elongation, resists slight floor settlement and thermal expansion & contraction to avoid waterproof layer cracking.
  4. Strong adhesion: Firm bonding to cement‑mortar substrate, resistant to hollowing, blistering and delamination.
  5. Long‑term water immersion resistance: Dense impermeable film, stable for long‑time soaking in shower area.
  6. Moisture & corrosion resistance: Adapt to hot‑humid bathroom environment, resist sewage corrosion and mildew growth.
  7. Convenient detail reinforcement: Extra‑thick coating around pipe roots and floor drains to strengthen weak waterproof areas.
  8. High mechanical strength after curing: Hard to be damaged during tile installation.
No. Test Item Technical Requirements
1 Appearance Uniform viscous paste, no gelation or agglomeration
2 Solid Content, % ≥85.0
3 Surface Dry Time, h ≤12
4 Through Dry Time, h ≤24
5 Tensile Strength, MPa ≥2.00
6 Elongation at Break, % ≥500
7 Tear Strength, N/mm ≥15
8 Low Temperature Bending Flexibility -35℃, no crack
9 Water Impermeability 0.3MPa, 120min, impermeable
10 Heating Shrinkage Rate, % -1.0~+1.0
11 Bond Strength, MPa ≥1.0
12 Water Absorption Rate, % ≤5.0

 

Application Method for Bathroom

  1. Substrate preparation: Keep floor and wall solid and flat. Remove dust, oil and loose mortar. Repair holes and cracks. Keep substrate dry, standing water is forbidden.
  2. Detail reinforcement: Apply 1‑2 coats as extra reinforcement layer for pipe roots, floor drains and corners, width ≥250mm per side. Start main construction after drying.
  3. Material stirring: Stir thoroughly after opening bucket. No proportioning required. Do not dilute with water. Seal bucket timely to avoid premature moisture‑curing.
  4. Multi‑layer trowel application: Apply thin coats repeatedly. Single heavy coat is prohibited. Apply next coat after previous coat dries, cross‑direction brushing. Total film thickness for floor ≥1.5mm; shower wall height ≥1.8m, other walls ≥300mm.
  5. Curing: Full natural curing. No water contact or treading during curing period.
  6. Water‑storage test: Perform 24‑48‑hour water‑storage test after full curing. Pass if no leakage downstairs.
  7. Protective layer & tile laying: Apply cement‑mortar protective layer after test acceptance, then lay ceramic tiles.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Weifang Shihua Chemical Building Material Co., Ltd.
Location Shouguang City, Shandong Province, China
Contact Person Faye Wang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.