Xi'An Tiptop Machinery Co., Ltd.
                                                                                                           
Verified Supplier
20 Years
Since 2006
Menu

Integral Heavy Weight Drill Pipe , Welded Drill Steel Pipe Hwdp In Aisi 4145h Material

Price Negotiable
Price: Negotiation
MOQ: 1pc
Delivery Time: 20-90 days
Brand: TIPTOP
Product Description

Downhole Drilling Tools, Integral and Welded Heavy Weight Drill Pipe (HWDP)

 

Tiptop offer both integral and welding heavy weight drill pipes. The integral HWDP is manufactured from one piece of AISI 4145H solid bar, fully heat treated, all physical properties conform to API Spec 7-1 latest edition. The welding HWDP is assembled by two pieces of tool joints and one piece of central pipe by inertial friction welding. The tools joints are manufactured from AISI4145H or 4137H alloy steel and the central pipe is manufactured from AISI 4130 alloy steel. The mechanical and chemical property of tools joints and central pipe are in conformity to API spec 7-1 latest edition.

 

Construction Heavy Weight Drill Pipe Material Yield Strength (ksi) Ultimate Strength
(ksi)
Elongation
(%)
Reduction of area (%) Hardness (Brinell HB) Min. Avg Charpy (ft/lbs @+75°C)
Welded Tool Joint: AISI 4145H or 4137H Bar ≥120 ≥140 13 45 285-340 41
Pipe Body: AISI 4130 Tube ≥65 ≥95 18 - ≥277 24
Integral AISI 4145H Bar ≥120 ≥140 13 45 285-340 41

 

Features:

· Reduced torque in high-rpm, deep drilling

· Less strip time as compared to handling a long string of drill collars

· Fewer tool-joint connection failures

· Easy in handling and transporting to and from locations

· Helpful for keep direction of directional well

 

HWDP specification

Nominal Size Length (ft) Tube Tool Joint Per foot lb Per joint (31ft) kg

Make-torque

(ft-lb)

ID WT End Upsets (B) Connection Size and Type Tool Joint OD Tool Joint ID
2 7/8 31 1 1/2 0.688 2 15/16 NC26 (2 3/8 IF) 3 3/8 1 1/2 17.26 247 3800
3 1/2 31 2 1/16 0.719 3 7/8 NC38 (3 1/2 IF) 4 3/4 2 1/16 25.65 370 11500
3 1/2 31 2 1/4 0.625 3 7/8 NC38 (3 1/2 IF) 4 3/4 4 7/8 2 1/4 23.48 335 11500
4 31 2 9/16 0.719 4 3/16 NC40 (4 FH) 5 1/4 4 7/8 2 9/16 29.92 430 14600
4 1/2 31 2 3/4 0.875 4 11/16 NC46 (4 IF) 6 1/4 2 3/4 41.45 595 22500
5 31 3 1 5 1/8 NC50 (4 1/2 IF) 6 5/8 3 50.38 710 30000
5 1/2 31 3 1/4 1.125 5 11/16 5 1/2 FH 7 1/4 3 1/4 61.63 890 41200
6 5/8 31 4 1/2 1.063 6 5/16 6 5/8 FH 8 4 1/2 71.43 1030 50500

 

Spiral HWDP specification

Nominal Size Length (ft) Tube Tool Joint Per foot lb Per joint (31ft) kg Make-torque (ft-lb)
ID WT End Upsets (B) Connection Size and Type Tool Joint OD Tool Joint ID
2 7/8 31 1 1/2 0.688 2 15/16 NC26 (2 3/8 IF) 3 3/8 1 1/2 18.31 261 3800
3 1/2 31 2 1/16 0.719 3 7/8 NC38 (3 1/2 IF) 4 3/4 2 1/16 27.14 390 11500
3 1/2 31 2 1/4 0.625 3 7/8 NC38 (3 1/2 IF) 4 3/4 4 7/8 2 1/4 24.88 360 11500
4 31 2 9/16 0.719 4 3/16 NC40 (4 FH) 5 1/4 4 7/8 2 9/16 31.51 455 14600
4 1/2 31 2 3/4 0.875 4 11/16 NC46 (4 IF) 6 1/4 2 3/4 43.31 621 22500
5 31 3 1 5 1/8 NC50 (4 1/2 IF) 6 5/8 3 52.34 750 30000
5 1/2 31 3 1/4 1.125 5 11/16 5 1/2 FH 7 1/4 3 1/4 63.87 915 41200
6 5/8 31 4 1/2 1.063 6 5/16 6 5/8 FH 8 4 1/2 74.62 1070 50500

 

Hardbanding

HWDP’s wear resistance hardbanding is standard on tool joints connections and central upset. Hardbanding is made by an automatic machine after preheating the pipe and is followed by stress relieving.

Standard Bands:

· One 4’’ wear band on both pin and box end, plus one 1’’ band on 18° shoulder of box.

· Two 3’’ wear bands on central upsets.

· The hardbanding is completely flush on both tool joints and 1/8’’ oversize on the central upset (fully flush on request)

The types of hardbanding include Iron-Matrix powder alloy, Tungsten Carbide Sparticle, Arnco 100XT, 300XT and TCS titanium.

 

Internal Plastic Coating

HWDP could be coated internally with DPC, TK34 or TC2000 as customer’s request, which are able to prevent corrosion and extend using time.

 

Initial Make up and Break out service

The factory Make-up and Break-out services, which is the most important factor affecting the life of the tool joint connections, is regarded as an important element to save rig handling time and greatly improve the efficiency on rig floor. The controlled make-up and break-in procedures are consistently applied to every tool joint and ensure the connections quality. Suitable dope and correct torque value are essential for the make-up and break-in procedures. Tiptop HWDP will supply perfect factory make-up and break-out services if order and inquiries.

 

Please contact us for your heavy weight drill pipe orders and inquiries.

 

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xi'An Tiptop Machinery Co., Ltd.
Location City window,Jinye Road,High Tech Zone, Xi'an, China
Contact Person Dan

Request A Quote

Please check your email address.
Your message must be at least 20 characters.