Sscg45-3500/9000 Seelong 0.3%Fs Suspension Dynamometer for Gasoline Engine Test

Price Negotiable
Price: 1st Tier: 1 Set, Unit Price USD 3.00 2nd Tier: 2-5 Sets, Unit Price USD 2.00 3rd Tier: Over 5 Sets, Unit Price USD 1.00
MOQ: 1
Delivery Time: 90 working days
Brand: Seelong
Product Description

Product description

 

This dynamometer is designed to complete the motor and control system performance test, pre-delivery inspection and durability assessment. This system uses ABB ACS880 series inverter system to control the dynamometer. Frequency conversion inverter system adopts AFE (active filter) type four quadrant operation frequency converter. The measurement and control system communicates with CPU unit of frequency converter through CAN bus. The whole system adopts power feedback technology to feedback the power directly connected to the grid.
The system has complete functions and can meet the following test requirements of the motor system: temperature rise test, motor torque speed characteristic, overload capacity test, responsiveness test, blocking test, maximum working speed test, overspeed test, feed test, working condition cycle test, etc.

 

Introduction

  • Simple structure, small volume, light weight, stable and reliable operation;
  • The motor has high power factor and high efficiency, maintains high efficiency and power factor within 20% - 120% rated range, and does not need to add power compensator;
  • Frequency conversion control can realize soft start, soft stop, stepless speed regulation, no impact, and further improve the energy-saving effect;
  • The motor has many topologies, which can meet the fundamental needs of mechanical equipment in a wide range and extreme conditions

 

Packing and shipping

 

 

FAQ

 

Q: What's the minimum order quantity for our cooperation?
A: We support small trail order of 1 pcs for stock products.
Q:How can I learn more about the products?
A: Please leave your email and we will send you your electronic sample book.
Q: What's your payment term?
A: Normally 40% T/T deposit, pay in full before shipment.
Q:What's the lead time for my orders?
A: Dynamometers production cycle is 6-8 weeks, sensors production cycle is 2-3 weeks, other products please contact with us.
Q: How do we get the overall solution of the test bench?
A: Leave us your email, our technical staff will communicate with you about the detailed plan.
Q: Can I come to visit your factory?
A: Sure, you are always welcome to have a visit.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Seelong Intelligent Technology(Luoyang)Co.,Ltd
Location NO 18 YANGUANG ROAD HIGH TECH DEVELOPMENT ZONE, LUOYANG AREA OF CHINA (HENAN) PILOT FREE TRADE ZONE
Contact Person Vicky Qi

Request A Quote

Please check your email address.
Your message must be at least 20 characters.