Dongguan Yixie Automation Equipment Co., Ltd.
                                                                                                           
Verified Supplier
Years
Since
Menu
Machinery Electronics Production Machinery

Online Automatic PCB Depaneling Machine 7 Axes 0.2mm-6.0mm Thickness

Price Negotiable
Price: Negotiate
MOQ: Negotiate
Delivery Time: 5-8 works
Brand: EXE Yixie
Product Description

Online Automatic Depaneling Machine EXE-880AT

 

Online Automatic Depaneling Machine Parameters:

keywords Online Automatic Splitter PCB board cutting thickness 0.2mm-6.0mm
Sub-board work range 300mmx350mm Main engine and dust collector voltage 220v 1φ and 3φ
XYZ drive mode ac servo motor power consumption 3.5kva
Number of motion axes 7 axes Static Elimination Gun  
program teaching method Color CCD video intuitive teaching input visual system High-resolution digital camera
Operation interface win7 window interface drive motor AC brushless servo motor
Upper vacuum power 2hp Mechanical pick and place arm Anti-static vacuum nozzle
Lower dust collector power 3hp (option 5hp) Feeding method rail transport
Cutting spindle sycotec (Germany) max80000rpm (automatic tool change) Outlet method Belt conveying or carrier output or rail conveying
x-y ac servo speed 0-1000mm/sec transfer method Vacuum suction nozzle adsorption transfer
z ac servo speed 0-800mm/sec flow direction left→right
x-y repeatability ±0.01mm program backup USB interface
Cutting accuracy ±0.02mm control method Dedicated controller
CCD camera calibration accuracy ±0.01mm Dust cabinet size 640mm×785mm×1760mm(d×w×h)
Split plate stress value Below 300uε Machine size 2014mm×1230mm×1650mm(d×w×h)
Tool diameter 0.8-2.3mm Host + dust collector weight 1000kg

 

 Introduction To Equipment Configuration:

(1): Clip-on plate-taking structure

1. Place the product sub-board fixture on the processing platform sub-board. After the processing is completed, clamp the parting jig and place it on the track to flow into the next process.



(2): The special product sub-board jig enters the track mode

 

(3): Discharge of special product plate jig guide rail
1. After the product is cut, the reclaiming fixture clamps the entire product fixture puts it on the unloading track, and transports it to the next production process.

 

(4): Automatic tool change mode
1. Adopt automatic tool changing spindle imported from Germany. Save time, realize automation, reduce human factors, high precision and strong stability
2. Five sets of milling cutter magazines are built-in, which is convenient for automatic replacement of milling cutters and meets the needs of sub-board processing.

 

(5): The structure of the vacuum suction cup
1. Pick-and-place device: automatic loading and unloading (modular vacuum suction claw, vacuum device, can be independently controlled)
2. Transmission structure: X2 axis moves Z2, Z3 axis suction cup, AC servo motor control.
3. Board taking speed: 0-1000mm/sec (can be set)

 

(6): Special product fixture tray discharge method
1. The vacuum suction cup take-up reel sucks the cut product in a one-time vacuum, places it on a special product fixture, and transports it to the next production process.

 

Quality Assurance And After-sales Service:
1. The overall warranty period of the equipment is one year. If there are quality problems, after-sales maintenance and replacement are provided free of charge.
2. The after-sales service personnel are all senior professional and technical personnel of the company. After the formal training of the company, you can work alone after passing the exam.
3. After the after-sales department receives the equipment failure notification, if the equipment fails to work normally, the Pearl River Delta will reply within half an hour, and dispatch personnel to the scene to solve it within 2 hours; the area outside the Pearl River Delta will reply within half an hour, and then according to the specific situation, within 24 hours Send after-sales personnel to the scene to solve the problem. (If the startup fails to produce normally, the after-sales personnel communicate with the customer and arrive at the scene within the time required by the customer).
4. The company's after-sales personnel are on standby 24 hours a day, regardless of Saturdays, Sundays and holidays.
5. After the equipment arrives at your company, our company will arrange engineering and technical personnel for installation and commissioning.
6. Our company can arrange after-sales technicians to stay in the customer's company for three days, responsible for training and technical guidance (the time can be extended according to the appropriate requirements of the customer) until they are accepted.
7. Our after-sales technicians are responsible for comprehensive training. Your company's operators and technicians will wholeheartedly serve the installation and operation of our company's equipment without reservation.
8. Under the premise of the customer company's request, our company can help the customer company to carry out the commissioning test of the sub-board machine for its technicians.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Dongguan Yixie Automation Equipment Co., Ltd.
Location Yixie Technology Building, No. 10, Shanquan Road, Yongtou, Chang'an Town, Dongguan City
Contact Person Wen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.