ASME SA213 TP321 Stainless Steel Seamless Tube For Boiler High Temperature Service

Price Negotiable
Price: Negotiable
MOQ: 100 KGS
Delivery Time: 20-80 days
Brand: Yuhong
Product Description

High-Frequency Welded ASME SA213 TP321 Stainless Steel Seamless Tube | Extreme Heat-Resistant Boiler & Superheater Piping

 

 

Product Overview

 

Yuhong introduces ​ASME SA213 TP321 Stainless Steel Seamless Tubes, designed for extreme-temperature boiler and superheater systems. These tubes combine ​titanium-stabilized chromium-nickel alloy durability with ​superior oxidation resistance, ideal for demanding thermal environments.

 


Key Features

 

1. Material & Chemical Composition
  • Base Material: ASME SA213 TP321 Austenitic Stainless Steel (Ti-stabilized).
  • Chemical Composition:
Element Cr Ni Ti C Mn
Composition 17.0-19.0% 9.0-12.0% ≥5×C% ≤0.08% ≤2.00%

Compliant with ASME SA213 and ASTM A213 standards.

 

 

2. Mechanical Properties
Property Value
Tensile Strength ≥515 MPa
Yield Strength ≥205 MPa
Elongation (A50) ≥40%
Operating Temperature Up to ​900°C (1650°F)
 
3. Manufacturing Process
  • High-Frequency Welding (HFW): Ensures ​95% weld integrity with seamless precision.
  • Heat Treatment: Solution annealing at ​1010-1120°C followed by rapid water quenching.
  • Surface Finish: Pickling + passivation for enhanced corrosion resistance.

 

4. Applications
  • Boilers & Superheaters: Water walls, steam pipelines, and reheater coils.
  • Heat Exchangers: Petrochemical and power plant condensers.
  • Oil & Gas: High-temperature reformers and sulfur recovery units.

Advantages

  1. High-Temperature Stability: Resists sensitization and intergranular corrosion at 450-850°C.
  2. Corrosion Resistance: Performs in acidic, sulfur-rich, and chloride environments.
  3. Customization: Available in ​OD 6-219mm and ​WT 0.5-30mm with lengths up to ​18m.

FAQ

Q1: What certifications do you provide?
A: ASME, ISO 9001, EN 10216-5, and PED 2014/68/EU.

 

Q2: Can these tubes withstand thermal cycling?
A: Yes, titanium stabilization prevents carbide precipitation during repeated heating/cooling.

 

Q3: What is the lead time for bulk orders?
A: Standard lead time is ​4-6 weeks for 20-ft container loads.

 


Why Choose Yuhong?

  • Advanced Facilities: 55 automated production lines with 3D laser cutting and CNC welding.
  • Global Compliance: Certified by ABS, DNV, GL, and GOST.
  • Technical Support: 110+ engineers offer tailored solutions for OD/WT adjustments and surface treatments.

Contact Us:

  • Email: jimmy@steelseamlesspipe.com
  • WhatsApp: +86 18892647377
  • Website: www.steelfintube.com

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company YUHONG HOLDING GROUP CO., LTD
Location 20 Floor, No.1 New World Building, NO.1018 Min'an Road, Yinzhou District, Ningbo, China, ZIP:315040
Contact Person Sales Dept.

Request A Quote

Please check your email address.
Your message must be at least 20 characters.