Sichuan Mondes Green Technology Co.,Ltd
                                                                                                           
Verified Supplier
11 Years
Since 2015
Menu

Wastewater Storage Glass Fused Bolted Steel Tanks 500000Gallons

Price Negotiable
Price: Please contact us
MOQ: 1 set
Delivery Time: 5~60 days
Brand: MDS
Product Description
500000 Gallons GFS Glass Fused Bolted Steel Tanks for Wastewater Storage
Product Overview

Glass fused to steel bolted steel tank, also known as GFS bolted tank, is a highly durable, reliable, and versatile storage solution. Its innovative design combines the strength of steel with the chemical and corrosion-resistant properties of glass, creating a tank capable of withstanding hostile environments.

500000 gallon GFS bolted steel tank for wastewater storage Large capacity GFS bolted steel tank installation

Key Benefits:

  • Modular design for easy assembly, installation, and future expansion
  • Prefabricated panels bolted together on-site for efficient construction
  • Customizable sizes and shapes to meet specific project requirements
  • Virtually maintenance-free - no painting or coating required
  • Superior chemical resistance for storing hazardous or corrosive materials
  • Versatile applications including water, wastewater, oil, and chemical storage
Material Characteristics

The steel substrate used in GFS bolted tanks is a specialized high-strength enamel steel, engineered for superior performance. Its mechanical properties (yield strength, tensile strength, and elongation) significantly exceed conventional steel plates.

Material Features: Low Carbon, High Strength, High Titanium.

Close-up of glass fused to steel tank material
Packaging

Each shipment undergoes rigorous quality control:

  • Double-checked plate codes and quality before packaging
  • PE foam separation between steel plates to protect coating surfaces
  • Plastic film wrapping and steel belt securing for pallet protection
  • Final packaging in sturdy wooden boxes
Delivery and Payment
  • Packing: Sea-worthy standard packing or customized options
  • Port of Loading: Any port in China
  • Payment Terms: 30% advance by T/T, 70% before shipment (L/C available for large orders)
  • Production Period: 15-45 days depending on order size
  • Shipping: Prompt dispatch upon full payment receipt
  • Service: Professional installation guidance provided
 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Sichuan Mondes Green Technology Co.,Ltd
Location ROOM 10, 20TH FLOOR, 1ST BUILDING, NO.588, MIDDLE SECTION OF YIZHOU AVENUE, HIGH-TECH ZONE, CHENGDU CITY, (SICHUAN) PILOT FREE TRADE ZONE, CHINA
Contact Person Richie

Request A Quote

Please check your email address.
Your message must be at least 20 characters.