Industrial Glass Lined Bolt Together Water Tanks Dark Green Coating Color
Price:
Please contact us
MOQ:
1 set
Delivery Time:
5~60 days
Brand:
YITIAN
Product Description
Industrial Glass Lined Steel Tanks Wastewater Storage Tank
Dark Green Coating Color
Product Overview
YITIAN industrial glass lined wastewater storage tank offers exceptional durability and performance for wastewater storage applications. Engineered from superior-quality steel, these tanks withstand extreme conditions including harsh weather, high pressure, and corrosive chemicals present in wastewater.

Key advantages of our industrial glass lined wastewater storage tanks:
- Customizable designs: Available in various shapes and sizes to meet specific requirements
- Quick installation: Prefabricated components enable rapid assembly compared to traditional concrete tanks
- Cost-effective: Reduced labor requirements and faster deployment lower overall project costs
Main Technical Parameters
| Parameter | Specification |
|---|---|
| Coating Color | Dark Blue, Dark Green or Customized |
| Coating Thickness | 0.25-0.45mm |
| Acid and Alkalinity Proof | Standard PH 3-11, Special PH 1-14 |
| Adhesion | 3.450N/cm |
| Hardness | 6.0 (mohs) |
| Service Life | ≥30 Years |
| Holiday Test | 900 ~ 1500v |
| Permeability | Gas Liquid Impermeable |
| Easy To Clean | Smooth, Anti-adhesion, Glossy, Inert |
| Elasticity | Same as steel plate, about 500KN/mm |
| Corrosion Resistance | Excellent, suitable for wastewater, concentrated brine, sea water, high sulfur crude oil, salt spray, organic and inorganic compounds |
Packaging
Our packaging process ensures maximum protection during transportation:
- Steel plates separated with PE foam to prevent coating damage
- Pallets completely covered with plastic film and secured with steel belts
- Final packaging in wooden boxes for optimal protection
Delivery and Payment
- Packing: Standard sea-worthy packaging with customization options available
- Port of Loading: Any port in China
- Payment Terms: 30% deposit by T/T, 70% balance before shipment (L/C acceptable)
- Production Period: 15-45 days depending on order complexity
- Shipping: Prompt arrangement upon full payment
- Service: Comprehensive after-sales support including installation guidance
Processing Technology

Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Sichuan Mondes Green Technology Co.,Ltd
Location
ROOM 10, 20TH FLOOR, 1ST BUILDING, NO.588, MIDDLE SECTION OF YIZHOU AVENUE, HIGH-TECH ZONE, CHENGDU CITY, (SICHUAN) PILOT FREE TRADE ZONE, CHINA
Contact Person
Richie