Guangzhou Changfeng Steel Co., LTD
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

High Duablity Plastic Mold Steel 1.2311 Plastic Mould Base MISUMI Standard

Price Negotiable
Price: As per your drawing
MOQ: 1 SET
Delivery Time: 20-30 days
Brand: Changfeng
Product Description

S50C/P20/1.2311 injection plactic mold base

 

 

TOLERANCE FOR STANDARD POCKET

 

Rough PockerCorner Radius

X Y R
≤210 ≤210 R25
>210 >210 R32

 

Rough Pocket Tolerance

Length-Less than finishing dimension 4-6mm

Width-Less than finishing dimension 4-6mm

Depth-Less than final depth 0.5-1mm

 

Finishing Pocket Corner Radius

Depth Radius
1-50 R13
51-100 R16.5

 

Q. How long is the lead time for mold?

A : It depends on the mold’s size and complexity. Normally, the lead time is 25-35 days. If the molds are very simple and not in big size, we can work out with 15 days.

 

Q. Before shipment, how to make sure the products quality?

A : We are specialized in high quality products. We have QC to inspect the products before each shipment. You can come to visit our factory or ask a third party for inspection. Or we can send you videos to show the production process.

 

Q. How could I pay them?

A : T/T, L/C are acceptable.

 

Q.Can I get discounts?

A : Yes, for big order, old customer and frequent customers, we give reasonable discounts.

 

Q. Which Shipment way is available?

A : By sea to your nearest port.

By air to your nearest airport.

By express (DHL, UPS, FEDEX, TNT, EMS) to your door.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Changfeng Steel Co., LTD
Location 广州市黄埔区大沙地东路403号B802房(仅限办公)
Contact Person Echo

Request A Quote

Please check your email address.
Your message must be at least 20 characters.