Guangzhou Changfeng Steel Co., LTD
                                                                                                           
Verified Supplier
14 Years
Since 2012
Menu

SAE1050 / S50C / P20 Standard Metal Mold Base For Injection Plastic Gloss Finish

Price Negotiable
Price: As per your drawing
MOQ: 1 SET
Delivery Time: 25-35 days
Brand: Changfeng
Product Description

S50C/P20/1.2311 injection plactic mold base

 

Mould making steps:
1. Samples/Drawing &Requirement from you
2. Mould design:we will Communicate and Exchange the opinion with you after you place order.
3. Material Purchase:Steel cutting and Mould base tooling.
4. Assembling.
5. Inspection of mould : following and controlling the tooling processing.
6. Mould testing:We will inform you the date.

Than will send the sample's inspection report&injection parameters with the sample to you!
7. Your instruction &confirmation for shipment.
8. Ready made mould before packing.

 

 

TOLERANCES FOR STANDARD MOULD PLATES

 

  Top Clamping Plate(Side Gate System) AB Plate Stripper Plate (Side Gate System) Support Plate Bottom Clamping Plate(Pin point Gate System) Top Clamping Plate(Pin point Gate System) Stripper Plate (Pin point Gate System) Stripper Plate Ejector Retainer Plate & Ejector Plate Spacer Block
Thickness +0.5~0 +0.4~+0.1
Width +0~-0.2 +1.0~0 +0.5~0 -1.5~+0.5
Length +0~-0.2 +1.0~0 +0~0.2
Perpendicularity 0.05/300 Datum corners:0.01/100 0.05/300 Datum corners:0.01/100 0.05/300 0.1/300
Datum corners:0.05/300 Datum corners:0.05/300
Parallelism 0.01/100
Chamfer(Plate width: 150-270mm) C1.5~C2.0
Chamfer(Plate width≥300mm) C2.0~C3.0

 

 

Q. How long is the lead time for mold?

A : It depends on the mold’s size and complexity. Normally, the lead time is 25-35 days. If the molds are very simple and not in big size, we can work out with 15 days.

 

Q. Before shipment, how to make sure the products quality?

A : We are specialized in high quality products. We have QC to inspect the products before each shipment. You can come to visit our factory or ask a third party for inspection. Or we can send you videos to show the production process.

 

Q. How could I pay them?

A : T/T, L/C are acceptable.

 

Q. Can I get discounts?

A : Yes, for big order, old customer and frequent customers, we give reasonable discounts.

 

Q. Which Shipment way is available?

A : By sea to your nearest port.

By air to your nearest airport.

By express (DHL, UPS, FEDEX, TNT, EMS) to your door.

 

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Guangzhou Changfeng Steel Co., LTD
Location 广州市黄埔区大沙地东路403号B802房(仅限办公)
Contact Person Echo

Request A Quote

Please check your email address.
Your message must be at least 20 characters.