ANSI Gas STD Sch20 Q235 DN1200 Carbon Steel Reducer
Description
Carbon steel reducer is one of chemical pipe fittings, which is used for the connection between two different pipe diameters. According to the shape, it can be divided into concentric and eccentric.
Carbon steel reducer adopts push, press, forging, casting and other processes, and polishing equipment is used for internal and external treatment, which meets the surface precision requirements, and is suitable for dairy, food, beer, beverage, pharmaceutical, cosmetics and other industrial fields. The connection mode mainly adopts clamp type, welding type and thread type.
Specification
Standard:GB / ANSI /JIS / DIN
Size:1/2"-48"(DN15-DN1200)
Application:gas,air,Connect Pipes
Characteristic
Reducer is mainly produced by 20 steel, Q235, Q345 and other materials. If divided by pressure level, there are about 17 kinds of them, mainly including: sch5s, sch10s, sch10, sch20, sch30, sch40s, STD, sch40, sch60, sch80s, XS; sch80, schh100, sch120, sch140, sch160, XXS; among them, STD and XS are the most commonly used.
The forming process is usually reduced, expanded or expanded. For some sizes of reducer, stamping can be used.
Technical data sheet
Carbon Steel Pipe Fittings Carbon steel reducer technical data sheet as below:
| NPS | Outside Diameter at Bevel | End-to- End, H | |
| Large End | Small End | ||
| 3/4X1/2 | 26.7 | 21.3 | 38 |
| 3/4X3/8 | 26.7 | 17.3 | 38 |
| 1x3/4 | 33.4 | 26.7 | 51 |
| lxl/2 | 33.4 | 21.3 | |
| 1.1/4x1 | 42.2 | 33.4 | 51 |
| 1.1/4X3/4 | 42.2 | 26.7 | |
| 1.1/4X1/2 | 42.2 | 21.3 | |
| 1.1/2x1.1/4 | 48.3 | 42.2 | 64 |
| 1.1/2x1 | 48.3 | 33.4 | |
| 1.1/2X3/4 | 48.3 | 26.7 | |
| 1.1/2x1/2 | 48.3 | 21.3 | |
| 2x1.1/2 | 60.3 | 48.3 | 76 |
| 2x1.1/4 | 60.3 | 42.2 | |
| 2x1 | 60.3 | 33.4 | |
| 2x3/4 | 60.3 | 26.7 | |
| 2.1/2x2 | 73 | 60.3 | 89 |
| 2.1/2X1.1/2 | 73 | 48.3 | |
| 2.1/2X1.1/4 | 73 | 42.2 | |
| 2.1/2x1 | 73 | 33.4 | |
Package
a. Plastic bubble bag package b.Wove bag package c.Pallet d. Customized.
Delivery time
Our Steel flat factory have high ability for production, the delivery time is 40 days for small quantity, or if you are hurry for that, we can arrange and meet your shipping date.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.