Xi'an Longjoy Foreign Trade Co.,Ltd
                                                                                                           
Verified Supplier
24 Years
Since 2002
Menu

Gas Sound Insulation DN200 Welding HDPE Pipe Tee

Price Negotiable
Price: Negotiation
MOQ: 100pcs
Delivery Time: Depends on the quantity of goods
Brand: HDPE tee
Product Description

HDPE Pipe Fittings HDPE tee

Description


HDPE tee uses high density polyethylene as the main material, which has the characteristics of sound insulation, heat resistance and high strength of cast iron pipe, as well as the characteristics of plastic pipe toughness, smoothness, easy installation, energy conservation and environmental protection. At the same time, it also overcomes the disadvantages of heavy quality of cast iron pipe, high engineering comprehensive cost, low strength and heat resistance of PVC-U pipe. It is an ideal drainage pipe product for modern high-rise buildings.

Technical data sheet


HDPE Pipe Fittings HDPE tee technical data sheet as below:

Specifications D d I L H PCs. / box
Φ20 27.5 19 16.5 54.5 27.5 400
Φ25 33.5 24 18.5 63 31.5 220
Φ32 42.5 31 21 74 37 130
Φ40 53.4 39 22 86 43 84
Φ50 66.6 49 25 102 51 46
Φ63 83.5 61.9 29 123 61.5 25

Specification


Standard:GB / ANSI /JIS / DIN

Size:DN10-200

Application:Gas/oil/water

Characteristic


HDPE tee has strong chemical corrosion resistance and can withstand the liquid discharge of ph2-ph12. It can continuously discharge domestic hot water not higher than 60 ℃, and the instantaneous drainage temperature can reach 80 ℃. It also has excellent impact resistance, and the main material has excellent low temperature impact resistance, which can be applied in the environment of - 20 ℃.

HDPE tee adopts advanced groove connection method, which has high stability after installation and can reduce installation cost. Compared with the traditional cast iron pipe, this kind of material has lower carbon emission and more energy saving in the whole production process.

Package


a. Plastic bubble bag package b.Wove bag package c.Pallet d. Customized.

Delivery time


Our Steel flat factory have high ability for production, the delivery time is 35 days for small quantity, or if you are hurry for that, we can arrange and meet your shipping date.

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Xi'an Longjoy Foreign Trade Co.,Ltd
Location Room 703, Land Center T2, YanZhan Road, No.1111, QuJiang New District, Xi'an China
Contact Person Rachel Zhang

Request A Quote

Please check your email address.
Your message must be at least 20 characters.