Gas DN80 Forged 25mm Elbow Threaded Pipe Fittings
Stainless steel threaded pipe fittings Stainless steel elbow
Description
Stainless steel elbow can be directly installed on the pipeline according to the connection mode and installed according to the use position. Generally, it can be installed at any position of the pipeline, but it needs to be sealed to prevent leakage and affect the normal operation of the pipeline. Elbow ball valve, globe valve, gate valve use, only for full open or full closed, not allowed to do flow regulation, so as to avoid sealing.
Stainless steel elbow should be inspected regularly when they are stored for a long time. The exposed processing surface should be kept clean and the dirt should be removed. They should be neatly stored in a ventilated and dry place indoors. Stacking or open storage is strictly prohibited. Always keep the stainless steel elbow dry and ventilated, keep the retainer clean and tidy, and store in accordance with the accurate storage method.
Technical data sheet
Stainless steel threaded pipe fittings Stainless steel elbow technical data sheet as below:
| DN | Outside diameter | 90 degree elbow | ||
| A series | B series | Long radius | Short radius | |
| 15 | 213 | 18 | 38 | - |
| 20 | 26.9 | 25 | 38 | - |
| 25 | 33.7 | 32 | 38 | 25 |
| 32 | 42.4 | 38 | 48 | 32 |
| 40 | 483 | 45 | 57 | 38 |
| 50 | 603 | 57 | 76 | 51 |
| 65 | 76.1(73) | 76 | 95 | 64 |
| 80 | 88.9 | 89 | 114 | 76 |
Specification
Standard:GB / ANSI /JIS / DIN
Size:3/4'',40mm,25mm
Packing:Wooden Case
Characteristic
Stainless steel elbow must be inspected on time and the surface must be cleaned. The storage position should be kept ventilated and dry, so as to avoid rust and other phenomena when the elbow is not used for a long time. When the elbow is installed, it can be placed according to the different use positions. The installation position can be at will, as long as the inspection and operation are ensured. During the installation, the tightness of the elbow should be ensured to prevent leakage, which will affect the operation of the whole pipeline.
Package
a. Plastic bubble bag package b.Wove bag package c.Pallet d. Customized.
Delivery time
Our Steel flat factory have high ability for production, the delivery time is 25 days for small quantity, or if you are hurry for that, we can arrange and meet your shipping date.
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.