Hunan Chengzhai Machinery Equipment Co., Ltd.
                                                                                                           
Verified Supplier
3 Years
Since 2023
Menu

MTU Generator Unit: Maintenance Cycle and Original Factory Parts List

Price Negotiable
Price: Call for discussion
MOQ: 1
Delivery Time: 15days
Brand: MTU
Product Description

I. MTU Generator Sets/Engines Full Range of Models (504000 kW)

1) Low-power (50200 kW; predecessor to the 1600 series/miniature model)

 4R0113/4R0120:DS50/60/80/100/125(50125kW)

 6R0113/6R0120:DS150/180/200(150200kW)

2) Medium power (200700 kW, 1600 series)

 1600 Series (in-line 6/8-cylinder):

 6R1600G20F:250kW

 8R1600G40F:400kW

 16V1600G80F:650700kW

3) Medium to large main units (7001300 kW, 2000 series)

 2000 Series (V8/V10/V12/V16):

 8V2000G25:750kW

 12V2000G23/G65:9001100kW

 16V2000G65:12001300kW

4) High-power (15004000 kW, 4000 series, flagship model)

 4000 series (V12/V16/V20):

 12V4000G23/G63:15001800kW

 16V4000G23/G63:20002500kW

[Image download failed]

 

II. MTU Standard Maintenance Cycle (W1W6, Universal)

W1 Start daily/each time (required)

 Oil level, coolant level, diesel level

 Leakage (oil/water), belt, air filter, battery terminals

 Alarm code, smoke color, water temperature/oil pressure

W2: 50 hours (first maintenance for new unit)

 Oil + Engine Filter (0031845301)

 Clean the air filter and drain the fuel oil and water

 Tighten the external bolts and check the belt tension

W3: 250 hours (minor maintenance)

 Oil + Engine Filter (2 units, 0031845301)

 Fuel fine filter (0020922801)

 Air filter inspection, belt/tensioner, cooling system

W4: 1000 hours (medium maintenance)

 Including all W3 items

 Air filter (2 units, 0180941002)

 fuel coarse filter/water separator (X52407500020)

 Valve clearance, injector inspection, turbine inspection

W5: 2000 hours/12 months (major maintenance)

 Including all W4 items

 Coolant replacement, belt + tensioner

 Injector calibration, high-pressure oil pump inspection

 Generator bearing lubrication, ECU calibration

W6: 40008000 hours (major overhaul)

 Cylinder liner, piston, piston rings, large and small bearings, valves, oil seals

 Major overhaul of the turbocharger; inspection and maintenance of the fuel system assembly

 

III. Key Maintenance Points for Common MTU Malfunctions

  to start: Low battery voltage, fuel misting into air, diesel filter clogging, poor injector atomization, ECU malfunction

 Black smoke/low power: Air filter clogged, injector failure, turbo failure, EGR stuck, insufficient cylinder pressure

 High water temperature: Water tank blockage, thermostat (0022035475) cannot be opened, belt slippage, insufficient coolant

 Low engine oil pressure: low oil level, clogged engine filter, worn oil pump, worn bearing bushings, sensor failure

 Electrical control alarm: Sensor failure (water temperature/oil pressure/rotational speed), wiring harness aging, ECU program anomaly

Get in Touch

Have questions about our products or want to discuss a custom order? Our team is ready to help you.

Company Hunan Chengzhai Machinery Equipment Co., Ltd.
Location Changsha Avenue, Yuhua District, Changsha, Hunan, China (Changsha) ASEAN Economic and Trade Cooperation Headquarters Base 1209
Contact Person sunny wen

Request A Quote

Please check your email address.
Your message must be at least 20 characters.