2.0mm Thermal Conductive Gap Pad with 1.5 W/mK Conductivity for LED Lamps and Electronics Cooling
Price:
0.1-10 USD/PCS
MOQ:
1000 pcs
Delivery Time:
3-8 work days
Brand:
Ziitek
Product Description
2.0mm Thermal Conductive Gap Pad for LED Lighting Applications
Ziitek TIF180-10UF is a silicone-based thermally conductive gap pad featuring an unreinforced construction for enhanced compliancy. This electrically isolating product offers low hardness, excellent conformability, and optimal thermal performance with easy handling.
Key Features
- Thermal conductivity: 1.5 W/mK
- Standard thickness: 2.0mm
- Hardness: 75 Shore 00
- Natural tackiness requires no additional adhesive
- Available in various thicknesses and hardness options
- Gray color for consistent appearance
Technical Specifications
| Property | Value |
|---|---|
| Product Name | TIF180-10UF Series |
| Color | Gray |
| Construction | Ceramic filled silicone elastomer |
| Specific Gravity | 2.2 g/cc |
| Thickness | 2.0mm |
| Hardness | 75 Shore 00 |
| Dielectric Constant @1MHz | 3.9 MHz |
| Continuous Use Temperature | -40 to 160℃ |
| Dielectric Breakdown Voltage | >5500 VAC |
| Thermal Conductivity | 1.5 W/mK |
| Volume Resistivity | 1.0×10¹² Ohm-cm |
Applications
- Cooling components to chassis or frame
- High-speed mass storage drives
- Heat sinking housing for LED-lit BLU in LCD displays
- LED TV and LED-lit lamps
- RDRAM memory modules
- Micro heat pipe thermal solutions
Documentation
Packaging & Lead Time
Packaging includes PET film or foam protection, paper card separation between layers, and export cartons. Custom packaging available. Lead time for 5,000 pieces is negotiable.
Company Information
Ziitek brings over 17 years of thermal interface material expertise with professional R&D capabilities and unique formulations. We provide quality, competitive products for long-term business partnerships.
Frequently Asked Questions
Q: How long is your delivery time?
A: Typically 3-7 working days for in-stock items, or 7-10 working days for custom orders depending on quantity.
A: Typically 3-7 working days for in-stock items, or 7-10 working days for custom orders depending on quantity.
Q: Do you provide samples? Is there a cost?
A: Yes, we offer free samples for evaluation.
A: Yes, we offer free samples for evaluation.
Related Videos
Get in Touch
Have questions about our products or want to discuss a custom order? Our team is ready to help you.
Company
Dongguan Ziitek Electronical Material and Technology Ltd.
Location
No.12 Xiju Road, Hengli Township, Dongguan City, 523465 Guangdong Province, China
Contact Person
Dana Dai